top of page
WhatsApp Image 2025-11-22 at 08.58.55 (2).jpeg

Disney Lookout Cay

Lighthouse Point

Location   Eleuthera Bahamas

Scope       Build Construction & Design-Build

Value        USD 22 Million

Client        Disney

Status       Completed. 2024

From groundbreaking in 2022 to the spectacular June 2024 opening, BEG proudly delivered the full waterplay, hardscape, and landscape scope for Disney Cruise Line’s stunning 900-acre destination on Eleuthera. Our work directly fueled the local economy by creating over 300 Bahamian jobs and crafting every outdoor guest experience with precision, sustainability, and authentic island spirit. BEG engineered and installed Rush Out Gush Out—the exhilarating family water zone with soaring geysers, twin tube slides, and interactive splash elements—alongside Sebastian’s Cove, the magical Little Mermaid-themed children’s splash pad featuring sea-creature fountains and shaded play zones. Every system incorporates advanced eco-friendly filtration and zero-runoff technology to safeguard the surrounding coral reefs. BEG poured and hand-finished miles of custom decorative concrete pathways, intricately etched with vibrant Junkanoo patterns, seashell motifs, and flowing wave designs. These durable, fully accessible trails—paired with elevated timber boardwalks—connect beaches, dining areas, and cultural pavilions while protecting the delicate dune ecosystems beneath. BEG transplanted and nurtured more than 200 native Bahamian species—sea grape, mangrove, gumbo limbo, buttonwood, and flowering cacti—forming lush, wildlife-friendly corridors that now support over 100 resident and migratory bird species. BEG didn’t just construct a destination—we shaped a living celebration of Bahamian heritage and natural beauty that will delight families for generations, all while leaving Eleuthera’s paradise pristine and thriving.

© 2026 by Hriday Bharaj

bottom of page